What the disclosures say.
Each layer below carries its own confidence tier and its own citation. There is deliberately no blended risk score: a single number would hide which parts are read from a filing and which are inferred.
Latest issued August 28, 2009. Article 6 — minor new source review. Issued by Northern.
Outside a Special Flood Hazard Area. Point-in-polygon lookup against the effective FEMA map.
Baseline water stress — the share of available surface water withdrawn each year in this basin. Overall water risk: Low - Medium (1-2).
PJM Data Miner 2 API key not configured (set PJM_API_KEY). PJM retired the public bulk queue download, so no interconnection match is asserted for this site.
Recovered from the text of permit 72368-4, adjacent to the facility/equipment description. Not a structured field in the DEQ listing.
Permit is held in the name of Yahoo (Oath).
No generator count could be read from the permit text.
Geocoded to 38.80396, -77.51097 via osm-nominatim, county cross-checked against the permit.
Where this site sits in the build.
Air permit issued 2009-08-28. Construction and operational status are not established by permit data alone. confirmed
No public operator statements have been recorded for this site. Company claims about capacity, cooling technology and water use are kept in this block, separate from the verified record above, and are never merged into it.
Every dated event on the record.
-
August 28, 2009
Air permit 72368-4 issued
Article 6 — minor new source review · source confirmed
-
Next
Next permit action
This page updates automatically when VA DEQ — Issued Air Permits for Data Centers publishes another permit or amendment for this facility.
Every permit behind this record.
| Registration | Issued | Program | Document |
|---|---|---|---|
| 72368-4 | August 28, 2009 | Article 6 — minor new source review | Permit PDF |
Spotted an error?
Fuzzy-matched fields are labelled as such and some will be wrong. Open an issue — corrections are tracked in public and noted on the page.