Problems we'd back a team on today. If you're building one, we'd like to hear from you.
Silicon & Quantum
Error correction and control software for quantum computers
Problem
A fault-tolerant quantum computer is mostly a classical computer. It needs a decoder that catches and fixes qubit errors in real time and a compiler that targets logical qubits, and only the biggest quantum companies have teams to build them.
Solution
A real-time decoder for a qubit type IBM's work doesn't cover, such as neutral atoms or trapped ions, sold as FPGA IP. From there, the control stack for every quantum vendor that can't build its own.
Timing
DOE's $215M Quantum Competition names its first teams no earlier than November 13, 2026. DOE wants a first scientifically useful machine by 2028.
Updated Nov 5, 2026
Frontier Systems
RF data and models for contested spectrum
Problem
Militaries and carriers are crowding into the same radio spectrum, and the models that classify signals in it lack labeled training data. A Navy topic asks for an 8-petabyte recorder because the department doesn't have the datasets.
Solution
A data engine that records, labels and curates radio signal data, and fine-tunes a model for each mission that runs on off-the-shelf software-defined radios.
Timing
The FCC plans to start auctioning 160 MHz of upper C-band on April 27, 2027, adding more shared spectrum to watch. The Army's spectrum warfare competition opens April 19.
Updated Nov 3, 2026
Frontier Systems
Recovering technical data for aging weapons
Problem
The military keeps weapons in service for decades after the drawings, manuals and code behind them have gone stale. Without usable data, it can't bring in a new supplier to make a replacement part.
Solution
Software that turns scanned drawings, parts lists and old manuals into a validated 3D model and a technical data package a supplier can build from, flagging gaps and data-rights markings. Every long-lived machine has the same problem.
Timing
The Air Force, Navy and DLA have posted 16 small-business topics asking for this since FY25. Two Air Force topics close November 25, 2026.
Updated Nov 3, 2026
Frontier Systems
Licensing and safety software for microreactors
Problem
Microreactor makers now answer to more than one regulator while their designs are still changing. The NRC's new rule for advanced reactors puts probabilistic risk assessment at the center of every application, and the Army will regulate the reactors it buys itself.
Solution
A digital twin that keeps one microreactor design's risk assessment and licensing basis current as the design changes, built for both the NRC and the Army. It can grow into the licensing and operations system for small reactors.
Timing
The Army has awarded up to $2.2B to five microreactor makers and wants the first one running by September 2028. DOE's fall small-business program includes a reactor digital twin topic, with first pitches due December 16, 2026.
Updated Nov 2, 2026
Frontier Systems
Risk underwriting for next-generation geothermal
Problem
Every enhanced geothermal project has to convince a lender that its wells will keep producing for decades. Lenders and insurers have no independent way to price that risk yet.
Solution
A model of well performance and decline for geothermal projects, sold to lenders and insurers. If its forecasts hold up, it becomes the underwriting standard for energy below ground.
Timing
Fervo went public in May 2026 and brought its first commercial plant online in September, financed with non-recourse debt. More of that plant comes online in early 2027, and every project behind it will need financing.
Updated Nov 2, 2026
Frontier Systems
Evidence and filings for on-demand gene editing
Problem
In February 2026 the FDA proposed approving gene editors based on how they work, so one editor could cover many mutations and new ones could be added without a new trial. Each new patient then becomes a small filing, and most of this work happens in academic labs with small teams.
Solution
Software that builds the evidence package for each new mutation. If on-demand gene editing scales, every patient's filing runs through a system like this.
Timing
Penn and CHOP's umbrella trial for seven urea cycle disorders can start once all seven investigational new drug applications are in place, which the team expects in 2027.
Updated Nov 2, 2026
Physical AI & Robotics
Power systems for robots on solid-state batteries
Problem
Humanoid robots need long runtime and can pay a premium for batteries, which makes them a likely first market for solid-state cells. Robot makers will have to qualify these cells with no agreed test standard, in packs that change with every redesign.
Solution
Cell qualification and battery management for humanoid makers moving to solid-state cells, with a safety file that buyers accept. From there, the power system for robots.
Timing
Samsung SDI plans to start mass production in the second half of 2027, with humanoid robots as the likely first application. Chinese cell makers are already shipping samples to robot companies.
Updated Nov 2, 2026
Frontier Systems
The toolchain for designed biology
Problem
Designing a protein or a cell with a model is getting cheap. Making it is not. Every designed sequence has to clear screening before a supplier will synthesize the DNA, and in California that check is becoming law.
Solution
Software that takes a designed construct, clears it, orders it and keeps a signed record of what was designed, cleared and made. Sold to teams that design sequences with models.
Timing
California's gene synthesis law makes screening a legal condition of selling synthetic DNA from January 1, 2027, and tighter rules apply from October 13, 2027.
Updated Oct 28, 2026
Frontier Systems
Seafloor monitoring for deep-sea mining and undersea infrastructure
Problem
The US is close to deciding its first commercial deep-sea mining permit, and the regulator can make ongoing seafloor monitoring a condition of it. Undersea cable owners now have to certify physical security plans too. Today, watching the deep seafloor takes a research ship.
Solution
Software that turns data from low-cost seafloor sensors into the plume and impact reports a mining permit will require. Cable owners, offshore wind and navies need the same picture of the seafloor.
Timing
The Metals Company expects NOAA to decide on its permit by the end of March 2027.
Updated Oct 28, 2026
Frontier Systems
Autonomy for low-cost military drones
Problem
The Pentagon plans to buy more than 200,000 small attack drones by 2027 and treats them as consumables. The airframes are getting cheap. Software that still finds and hits a target when GPS and radio links are jammed is scarce.
Solution
A navigation and terminal guidance module that drone makers drop in to pass the program's tests, priced for drones that cost a few thousand dollars. Most of the companies competing for orders would rather buy this than build it.
Timing
The Drone Dominance Program buys in rounds, with a fly-off before each large order. The next one, Gauntlet 3, is expected around February 2027.
Updated Oct 28, 2026
Frontier Systems
Software for orbital data centers
Problem
The first data center satellites are about to go into service. Radiation corrupts computation in orbit, and the link to the ground can only carry so much data.
Solution
An inference runtime that tolerates radiation, plus software that decides what to process in orbit and what to send down. The goal is to run the orbital cloud without building the satellites.
Timing
Starcloud-2 aims to be fully operational in orbit in 2027.
Updated Oct 28, 2026
Silicon & Quantum
Yield and process control for new fabs
Problem
New companies are building chip fabs and lithography in the US for the first time in a generation. A new process starts with no production history, so there is very little data to learn its defects from.
Solution
Defect classification that works from small amounts of data, sold to new fabs. The company that learns the new process first can grow into its inspection and metrology supplier, the way KLA did for the last one.
Timing
Substrate says its US foundry will be running wafers by 2028.
Updated Oct 28, 2026
Frontier Systems
Software for running lab instruments with AI
Problem
AI models can propose experiments far faster than people can run them. Beamlines, microscopes and liquid handlers were built for human operators, and connecting an agent to one safely means new drivers, control loops and interlocks for each instrument.
Solution
Software that lets an agent run one class of instrument at DOE facilities in a closed loop, with interlocks a facility safety officer will sign off on and a record of every experiment the AI chose. That record gets more valuable as more R&D runs this way.
Timing
DOE's Genesis Mission is paying national-lab facilities to run AI-driven experiments. Phase II applications are due December 17, 2026.
Updated Oct 28, 2026
Frontier Systems
Neuron-on-chip assays now, biological computing later
Problem
The FDA wants animal testing to become the exception, so pharma needs human neural tests that regulators will accept instead. Computing with living neurons, the bigger prize, is at least a decade away.
Solution
Analysis software and a data standard for neurons grown on electrode arrays, sold to pharma for drug discovery and neurotoxicity testing. That revenue pays for the longer road to biological computing.
Timing
The FDA's April 2025 roadmap aims to make animal studies the exception within three to five years. We expect the first neural assays to seek regulatory acceptance in 2027 and 2028.
Updated Oct 28, 2026
Frontier Systems
Power for data centers that can flex
Problem
New AI capacity waits years for a grid connection. Grid operators are deciding whether data centers that cut load on demand should get faster access, and they will need proof that a site actually cuts back when asked.
Solution
Metering and curtailment software whose numbers a grid operator accepts as a commitment. Once those numbers are trusted, the company can sell the combined flexibility of many sites into power markets and become the power supplier for compute.
Timing
Federal regulators ordered six grid operators in June 2026 to justify their rules for large loads. PJM holds its next capacity auction in December 2026.
Updated Oct 28, 2026
Silicon & Quantum
Memory and optical interconnect tooling
Problem
Inside AI hardware, moving data now costs more energy than computing on it. The fixes are faster stacked memory, optics in place of copper, and model weights built into the chip. Each one takes billions in capex.
Solution
The tools those chip and optics companies need, starting with a compiler that turns a model checkpoint into a chip design with the weights built in. A tools company sees the bottleneck before anyone else, and the right team can grow into selling the part that fixes it.
Timing
SK hynix plans mass production of its next high-bandwidth memory, HBM4E, in 2027. Switches with optics inside the package are due in the second half of 2026.
Updated Oct 28, 2026
Physical AI & Robotics
Safety evidence for learning robots
Problem
Robots that learn from data get retrained often, and each new version reopens the question of whether the robot is still safe. Certifiers need evidence for every change, and robot makers have no fast way to produce it.
Solution
A pipeline that turns a robot's logs into the file a certifier asks for and tracks what changed at each retrain. The evidence has to come from someone other than the maker, which makes it hard for a robot company to bundle.
Timing
The EU Machinery Regulation applies on January 20, 2027. From that date, machinery whose safety relies on machine learning needs third-party sign-off.
Updated Oct 28, 2026
Silicon & Quantum
AI chip design tools for the work Synopsys and Cadence won't do
Problem
Synopsys and Cadence are adding AI verification agents to the licenses chip teams already pay for, so a startup selling verification is up against a free feature. The slow part of a chip project shifts to the back end, where placement and timing depend on each company's own past designs.
Solution
An agent for timing closure, trained on a customer's own tape-outs and run inside its firewall. After that, tools for teams that mix Synopsys, Cadence and Siemens flows, since none of the three will tune for a rival's tools.
Timing
Both companies' agents reach customers by the end of 2026, so the back-end crunch shows up in 2027 design cycles.
Updated Oct 28, 2026
Frontier Systems
Proof checking for AI-written code
Problem
Agents write code faster than people can review it, and passing tests doesn't prove the code is right. Formal proofs do, but until now they cost too much for anything outside avionics and chip design.
Solution
An independent proof checker that runs in CI, accepts proofs from any model and produces evidence a regulator or insurer will accept. Start in one field where a bug is expensive, such as embedded firmware or crypto libraries.
Timing
The EU Cyber Resilience Act fully applies on December 11, 2027. Software sold in the EU will need evidence of secure design, and companies spend 2027 preparing it.
Updated Oct 28, 2026
Frontier Systems
Identity and permissions for AI agents
Problem
Most agents log in with a person's credentials or a shared service account that can do far more than the task needs. With ten agents that's manageable. With thousands, nobody can tell which agent did what, or switch off just one.
Solution
A credential broker that gives each agent short-lived access to exactly what one task needs, plugs into the identity provider a company already uses, and keeps an audit log the security team can search. It has to work across clouds and identity vendors, since each of them will bundle a version for its own customers.
Timing
Agent fleets move from pilots into production during 2027. The EU AI Act's rules for high-risk systems apply from December 2, 2027.
Updated Oct 26, 2026
Open Infrastructure
Verifying and paying for agent work
Problem
Regulated US stablecoins are coming, and issuers' anti-money-laundering programs assume a human customer. When an agent holds a wallet and pays, the issuer still has to know who is accountable for it and what it's allowed to spend.
Solution
A signed credential that ties an agent to a verified person or company and its spending limits, and a verifier that issuers and exchanges call when the payment happens. Checking that the agent actually did the work it was paid for comes next.
Timing
The OCC's rule implementing the GENIUS Act takes effect on January 18, 2027.
Updated Oct 26, 2026
Silicon & Quantum
Software for agent CPUs
Problem
AI agents spend most of their time on ordinary CPU work: calling tools, compiling code, starting sandboxes. Today's sandbox software was designed for a few dozen virtual machines per server. NVIDIA says one of its new agent racks holds more than 22,500 environments.
Solution
A sandbox runtime that starts and forks agent environments in milliseconds and fits far more of them on each rack, shipped with an open benchmark so buyers can check the numbers themselves.
Timing
NVIDIA and Arm both start shipping CPUs built for agents by the end of 2026, and those racks fill up in 2027.
Updated Oct 26, 2026
Open Infrastructure
Operations for mixed AI clusters
Problem
New AI racks mix NVIDIA GPUs with inference chips, liquid cooling and, soon, optics packaged inside the switch. They break in new ways, and neoclouds and enterprises can't hire hyperscaler-size teams to keep them running.
Solution
Failure diagnosis and repair for these racks, sold with an uptime guarantee and delivered by software plus technicians on site. As what the technicians learn turns into software, margins grow faster than headcount.
Timing
NVIDIA's Vera Rubin systems and its first co-packaged optics switches reach neoclouds in the second half of 2026.
Updated Oct 26, 2026
Building one of these? Write to [email protected] — warm intros preferred.