What the disclosures say.
Each layer below carries its own confidence tier and its own citation. There is deliberately no blended risk score: a single number would hide which parts are read from a filing and which are inferred.
Latest issued n/a. . Issued by CO.
Outside a Special Flood Hazard Area. Point-in-polygon lookup against the effective FEMA map.
Baseline water stress — the share of available surface water withdrawn each year in this basin. Overall water risk: High (3-4).
The Western Interconnection covers this site; Groundwork has only wired up PJM so far, so no queue position is asserted here.
Street address as published in EPA’s air-permit facility registry — a structured field, not text mined from a document.
No operator could be resolved from the permittee name.
Equipment counts come from reading a state permit document. Outside Virginia, Groundwork has the facility registry but not yet the permit text.
Geocoded to 39.57742, -104.86477 via epa-echo, county cross-checked against the permit.
Where this site sits in the build.
Facility holds an active air permit in EPA’s registry. Construction and operational status are not established by registry data alone. confirmed
No public operator statements have been recorded for this site. Company claims about capacity, cooling technology and water use are kept in this block, separate from the verified record above, and are never merged into it.
Every dated event on the record.
-
Next
Next permit action
This page updates automatically when EPA ECHO — air-permitted facility registry publishes another permit or amendment for this facility.
Every permit behind this record.
| Registration | Issued | Program | Document |
|---|
Spotted an error?
Fuzzy-matched fields are labelled as such and some will be wrong. Open an issue — corrections are tracked in public and noted on the page.